Approval from state expertise for the design documentation and engineering surveys.

  • 10.02.2023
Approval from state expertise for the design documentation and engineering surveys.

The company received approval (No. 49-2-1-3-023353-2021) from state expertise for the design documentation and engineering surveys on April 30, 2021 as part of the project “Mining and processing plant based on Pavlik gold deposit (Magadan Region, Tenkinsky District). Expansion to 10 million tons of ore per year. External power supply”.