RU
+7 (831) 233-30-30
Home
About
Description
portfolio
Contacts

Directions

Designing electric substations

Engineerring studies and mapping

Planning of energy systems development

Design of power transmission lines

Information and analytical services

similar projects

330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

Development of technical solutions for the redistribution of heat load from CHPP-12 — a branch of Mosenergo PJSC to other sources of thermal energy of Mosenergo PJSC

Development of technical solutions for the redistribution of heat load from CHPP-12 — a branch of Mosenergo PJSC to other sources of thermal energy of Mosenergo PJSC

The company completed a full range of design works and engineering surveys for the title «Mining and processing enterprise at the PAVLIK gold deposit (Magadan Region, Tenkinsky district). Increase of ore output to 10 million tons per year. External power supply»

The company completed a full range of design works and engineering surveys for the title «Mining and processing enterprise at the PAVLIK gold deposit (Magadan Region, Tenkinsky district). Increase of ore output to 10 million tons per year. External power supply»

recent projects

News

Approval from state expertise for the expert assessment of estimated construction costs.
Approval from state expertise for the expert assessment of estimated construction costs.
Approval from state expertise for the design documentation and engineering surveys.
Approval from state expertise for the design documentation and engineering surveys.
Approval from state expertise for the design documentation and engineering surveys.
Approval from state expertise for the design documentation and engineering surveys.
Approval from state expertise for the project “110 kV overhead transmission line Kropotkinskaya — Verninskaya No. 2 with reconstruction of 110 kV Verninskaya substation”
Approval from state expertise for the project “110 kV overhead transmission line Kropotkinskaya — Verninskaya No. 2 with reconstruction of 110 kV Verninskaya substation”
Approval from state expertise for the project “Reconstruction of Yuzhno-Sakhalinskaya substation”.
Approval from state expertise for the project “Reconstruction of Yuzhno-Sakhalinskaya substation”.

Clients

  • Home
  • About
  • Trust us
  • Contacts
2010-2023 ETS-Project LLC