RU
+7 (831) 233-30-30
Home
About
Description
portfolio
Contacts

Портфолио

Все проекты
Все
ENGINEERING STUDIES AND MAPPING
Planning of the development of heat supply systems
330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

Development of technical solutions for the redistribution of heat load from CHPP-12 — a branch of Mosenergo PJSC to other sources of thermal energy of Mosenergo PJSC

Development of technical solutions for the redistribution of heat load from CHPP-12 — a branch of Mosenergo PJSC to other sources of thermal energy of Mosenergo PJSC

The company completed a full range of design works and engineering surveys for the title «Mining and processing enterprise at the PAVLIK gold deposit (Magadan Region, Tenkinsky district). Increase of ore output to 10 million tons per year. External power supply»

The company completed a full range of design works and engineering surveys for the title «Mining and processing enterprise at the PAVLIK gold deposit (Magadan Region, Tenkinsky district). Increase of ore output to 10 million tons per year. External power supply»

COMPREHENSIVE PROGRAM FOR THE DEVELOPMENT OF ELECTRIC POWER GRIDS WITH A VOLTAGE OF 35 kV AND ABOVE IN THE TERRITORY OF ST. PETERSBURG AND THE LENINGRAD REGION FOR THE PERIOD 2019-2024 (INCLUDING THE SCHEME AND PROGRAM FOR THE PROSPECTIVE DEVELOPMENT OF THE ELECTRIC POWER INDUSTRY OF ST. PETERSBURG FOR THE PERIOD 2019-2023); 2021-2025 WITH THE PERSPECTIVE UP TO 2048 (INCLUDING THE SCHEME AND PROGRAM FOR THE PROSPECTIVE DEVELOPMENT OF THE ELECTRIC POWER INDUSTRY OF ST. PETERSBURG FOR THE PERIOD 2020-2024); 2022-2026 WITH PERSPECTIVE UP TO 2048; 2022-2027.

COMPREHENSIVE PROGRAM FOR THE DEVELOPMENT OF ELECTRIC POWER GRIDS WITH A VOLTAGE OF 35 kV AND ABOVE IN THE TERRITORY OF ST. PETERSBURG AND THE LENINGRAD REGION FOR THE PERIOD 2019-2024 (INCLUDING THE SCHEME AND PROGRAM FOR THE PROSPECTIVE DEVELOPMENT OF THE ELECTRIC POWER INDUSTRY OF ST. PETERSBURG FOR THE PERIOD 2019-2023); 2021-2025 WITH THE PERSPECTIVE UP TO 2048 (INCLUDING THE SCHEME AND PROGRAM FOR THE PROSPECTIVE DEVELOPMENT OF THE ELECTRIC POWER INDUSTRY OF ST. PETERSBURG FOR THE PERIOD 2020-2024); 2022-2026 WITH PERSPECTIVE UP TO 2048; 2022-2027.

Updating the Heat Supply Scheme of the city of Moscow for the period up to 2035 (updating for 2023)

Updating the Heat Supply Scheme of the city of Moscow for the period up to 2035 (updating for 2023)

Technological and price audit of projects included in the investment program, draft changes to the investment program, as well as reports on the implementation of the investment program of PJSC Lenenergo in 2020-2023.

Technological and price audit of projects included in the investment program, draft changes to the investment program, as well as reports on the implementation of the investment program of PJSC Lenenergo in 2020-2023.

The company completed a full range of design and survey work for the title «Reconstruction of the 220 kV Kotovskaya substation in terms of the construction of an artesian well, reconstruction of a fire extinguishing pumping station, a fire water tank»

The company completed a full range of design and survey work for the title «Reconstruction of the 220 kV Kotovskaya substation in terms of the construction of an artesian well, reconstruction of a fire extinguishing pumping station, a fire water tank»

Preliminary engineering study “Scheme of external power supply to consumers of the 35 kV network in the area of the 330 kV substation Volkhov-Severnaya”

Preliminary engineering study “Scheme of external power supply to consumers of the 35 kV network in the area of the 330 kV substation Volkhov-Severnaya”

Updating the Heat Supply Scheme of the city of Moscow for the period until 2035 based on the results of 2019

Updating the Heat Supply Scheme of the city of Moscow for the period until 2035 based on the results of 2019

  • Home
  • About
  • Trust us
  • Contacts
2010-2025 ETS-Project LLC