ENGINEERING STUDIES AND MAPPING
Planning of the development of heat supply systems
330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

330 KV OHTL PETROZAVODSKAYA — TIKHVIN-LITEINY

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

CONSTRUCTION OF THE 110 KV OHTL KROPOTKINSKAYA — VERNINSKAYA No. 2 WITH A BRANCH LINE TO THE POLYUS DISTRIBUTION SUBSTATION INCLUDING THE RECONSTRUCTION OF THE 110 KV VERNINSKAYA SUBSTATION

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

RECONSTRUCTION OF 110 KV SUBSTATION No. 24 RZHEVKA IN TERMS OF INSTALLING AN ADDITIONAL 25 MVA TRANSFORMER AND 20 kV INDOOR SWITCHGEAR COMPRISING 9 CELLS.

Technological and price audit of projects included in the investment program, draft changes to the investment program, as well as reports on the implementation of the investment program of PJSC Lenenergo in 2020-2023.

Technological and price audit of projects included in the investment program, draft changes to the investment program, as well as reports on the implementation of the investment program of PJSC Lenenergo in 2020-2023.

The company completed a full range of design and survey work for the title «Reconstruction of the 220 kV Kotovskaya substation in terms of the construction of an artesian well, reconstruction of a fire extinguishing pumping station, a fire water tank»

The company completed a full range of design and survey work for the title «Reconstruction of the 220 kV Kotovskaya substation in terms of the construction of an artesian well, reconstruction of a fire extinguishing pumping station, a fire water tank»

Preliminary engineering study “Scheme of external power supply to consumers of the 35 kV network in the area of the 330 kV substation Volkhov-Severnaya”

Preliminary engineering study “Scheme of external power supply to consumers of the 35 kV network in the area of the 330 kV substation Volkhov-Severnaya”