Preliminary engineering study “Scheme of external power supply to consumers of the 35 kV network in the area of the 330 kV substation Volkhov-Severnaya”

CUSTOMER:
PJSC FGC UES – Main Power Networks of the North-West
PERIOD OF EXECUTION:
2018 - 2022

Project goals:

The company developed the proposals to re-plant the 35 kV cable lines of the 330 kV Volkhov-Severnaya substation from the 35 kV indoor switchgear into the prefabricated 35 kV GIS.

Solution and implementation:

Within the project the company completed the following tasks:

    • development of proposals;
  • selection and approval of the best option.

Result achieved:

The optimal variant of measures related to the re-planting of the 35 kV cable lines of the 330 kV Volkhov-Severnaya substation from the 35 kV indoor switchgear into the prefabricated 35 kV GIS was selected and agreed with all interested parties.